{"id":75904,"date":"2026-10-07T11:37:51","date_gmt":"2026-10-07T09:37:51","guid":{"rendered":"https:\/\/pacaradamodularsystems.de\/?page_id=75904"},"modified":"2026-10-08T19:30:16","modified_gmt":"2026-10-08T17:30:16","slug":"office-to-residential-conversion","status":"publish","type":"page","link":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/office-to-residential-conversion\/","title":{"rendered":"Office to residential: conversion with modular construction"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row el_class=&#8221;pac-guide-2026&#8243;][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_empty_space height=&#8221;50px&#8221;][vc_column_text]<\/p>\n<h2 style=\"font-size: 30px; text-align: left;\">Office to residential: conversion with modular construction<\/h2>\n<p style=\"font-size: 15px; line-height: 1.5; text-align: left; color: #5b6770; margin-bottom: 26px;\">Pacarada Modular Building Systems, Kelkheim (Taunus), Germany \u00b7 Last updated: October 2026<\/p>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Vacant office buildings can become homes. This saves land, keeps the structure and is often faster than demolition and new construction. Modular construction helps in three places: with prefabricated bathroom modules inside the existing building, with extensions and with added storeys.<\/p>\n<figure class=\"pac-fig pac-fig--crop\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/10\/modulbau-darmstadt-umbau-buero-zu-wohnungen.jpg\" srcset=\"\/wp-content\/uploads\/2026\/10\/modulbau-darmstadt-umbau-buero-zu-wohnungen-768x512.jpg 768w, \/wp-content\/uploads\/2026\/10\/modulbau-darmstadt-umbau-buero-zu-wohnungen.jpg 1000w\" sizes=\"(max-width: 767px) calc(100vw - 60px), 790px\" width=\"1000\" height=\"667\" alt=\"Conversion of an office building into homes in Darmstadt using modular construction, building in scaffolding\" fetchpriority=\"high\" \/><figcaption>Darmstadt: an office building becomes 197 homes.<\/figcaption><\/figure>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">Why conversion is in demand<\/h3>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">In many cities office space stands empty while homes are missing. Office buildings are often centrally located, connected to roads, utilities and public transport, and have a sound skeleton of columns and floor slabs. Converting instead of demolishing uses what is already there: a large share of the embodied energy of a building is in its structure.<\/p>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">What is checked before the conversion<\/h3>\n<table class=\"pac-table pac-table--cards\" style=\"width: 100%; border-collapse: collapse; font-size: 16px; line-height: 1.5; margin: 12px 0 8px;\">\n<thead>\n<tr>\n<th scope=\"col\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Topic<\/th>\n<th scope=\"col\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Question<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td data-label=\"Topic\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Structure<\/td>\n<td data-label=\"Question\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">What loads can columns, floors and foundations take, including added storeys and new bathrooms?<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Topic\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Building depth and daylight<\/td>\n<td data-label=\"Question\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Can apartments be arranged so that all habitable rooms have windows?<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Topic\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Room height and grid<\/td>\n<td data-label=\"Question\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Do apartment layouts fit the column grid? Is there enough height for new floor build-ups and services?<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Topic\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Fire protection<\/td>\n<td data-label=\"Question\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Do the building class, escape routes and the requirements for party walls and floors change?<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Topic\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Sound insulation<\/td>\n<td data-label=\"Question\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Do floors and new party walls reach the values required for apartments under DIN 4109?<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Topic\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Building services<\/td>\n<td data-label=\"Question\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Where do the risers for bathrooms and kitchens run? Which heating and ventilation are possible?<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Topic\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Hazardous materials<\/td>\n<td data-label=\"Question\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Are there contaminants in the existing building that must be removed before the conversion?<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Topic\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Planning law<\/td>\n<td data-label=\"Question\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Is residential use permitted at the location? The change of use needs a building permit.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">What modular construction contributes<\/h3>\n<ul style=\"font-size: 18px; line-height: 1.6; text-align: left; margin: 0 0 18px 22px; padding-left: 0;\">\n<li style=\"margin-bottom: 8px;\"><strong>Bathroom modules:<\/strong> finished bathrooms from the factory are brought into the existing building and connected. This shortens the fit-out and ensures consistent quality.<\/li>\n<li style=\"margin-bottom: 8px;\"><strong>Extension:<\/strong> where floor area is missing, or stairs, lifts and balconies are needed, prefabricated components are added.<\/li>\n<li style=\"margin-bottom: 8px;\"><strong>Added storeys:<\/strong> additional lightweight storeys create more living space on the same plot. More on this in the article <a href=\"\/en\/modular-building-guide\/adding-storeys-modular\/\">Adding storeys and extensions with modular construction<\/a>.<\/li>\n<li style=\"margin-bottom: 8px;\"><strong>Short construction time:<\/strong> factory production and the work in the existing building run in parallel.<\/li>\n<li style=\"margin-bottom: 8px;\"><strong>Fitting the existing building:<\/strong> in the Pacarada system, columns and beams (1D), wall and floor elements (2D) and room modules (3D) can be combined. The new parts follow the grid of the existing building.<\/li>\n<\/ul>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">Darmstadt example: 197 homes in a former office building<\/h3>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">In Darmstadt, Germany, a vacant office building was converted into 197 homes, with bathroom modules inside the existing building, an extension and added storeys.<\/p>\n<table class=\"pac-table pac-table--cards\" style=\"width: 100%; border-collapse: collapse; font-size: 16px; line-height: 1.5; margin: 12px 0 8px;\">\n<thead>\n<tr>\n<th scope=\"col\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Key figure<\/th>\n<th scope=\"col\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Value<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td data-label=\"Key figure\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Location<\/td>\n<td data-label=\"Value\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Darmstadt<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Key figure\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Before<\/td>\n<td data-label=\"Value\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">vacant office building<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Key figure\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">After<\/td>\n<td data-label=\"Value\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">197 homes<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Key figure\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Measures<\/td>\n<td data-label=\"Value\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">bathroom modules in the existing building, extension, added storeys<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Key figure\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Construction time<\/td>\n<td data-label=\"Value\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">18 months (09\/2021 to 02\/2023)<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Key figure\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Time advantage<\/td>\n<td data-label=\"Value\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">44% faster than conventional construction<\/td>\n<\/tr>\n<tr>\n<td data-label=\"Key figure\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Energy standard<\/td>\n<td data-label=\"Value\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">KfW 55<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">Planning law in Germany: change of use and the acceleration law<\/h3>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Turning offices into homes is a change of use and needs a building permit. The authority checks whether residential use is permitted at the location under planning law and whether the building meets the requirements for apartments. Since 30 October 2025, section 246e of the Federal Building Code (the \u201cBau-Turbo\u201d) has made such projects easier: with the consent of the municipality, deviations from planning law are possible until the end of 2030, expressly including the conversion of existing buildings into housing and added storeys. More on this in the article <a href=\"\/en\/modular-building-guide\/building-permit-modular-construction-germany\/\">Building permits for modular buildings in Germany<\/a>.<\/p>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">Funding<\/h3>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">If the conversion reaches an efficiency house standard, federal promotional loans may be available. The article <a href=\"\/en\/modular-building-guide\/funding-modular-buildings-germany\/\">Funding for modular buildings in Germany<\/a> gives an overview.<\/p>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">Frequently asked questions<\/h3>\n<h4 style=\"font-size: 19px; text-align: left; margin-top: 22px;\">Is converting offices into homes worthwhile?<\/h4>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">It depends on the building: on structure, building depth, room height, fire protection and planning law. If the existing building is suitable, conversion saves the structure, time and land. An assessment of the existing building therefore always comes first.<\/p>\n<h4 style=\"font-size: 19px; text-align: left; margin-top: 22px;\">Does the change of use need a building permit?<\/h4>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Yes. In Germany, changing from office to residential use is a change of use that requires a permit. Since October 2025 the municipality can consent to deviations from planning law under section 246e of the Federal Building Code, limited until the end of 2030.<\/p>\n<h4 style=\"font-size: 19px; text-align: left; margin-top: 22px;\">How long does such a conversion take?<\/h4>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">It depends on the size and condition of the building. In Darmstadt the conversion into 197 homes with an extension and added storeys took 18 months, which was 44% faster than conventional construction.<\/p>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">More articles in the modular building guide<\/h3>\n<ul style=\"font-size: 18px; line-height: 1.6; text-align: left; margin: 0 0 18px 22px; padding-left: 0;\">\n<li style=\"margin-bottom: 8px;\"><a href=\"\/en\/modular-building-guide\/modular-vs-conventional-construction\/\">Modular or conventional construction? A comparison<\/a><\/li>\n<li style=\"margin-bottom: 8px;\"><a href=\"\/en\/modular-building-guide\/adding-storeys-modular\/\">Adding storeys and extensions with modular construction<\/a><\/li>\n<li style=\"margin-bottom: 8px;\"><a href=\"\/en\/modular-building-guide\/modular-schools-nurseries\/\">Modular schools and nurseries<\/a><\/li>\n<li style=\"margin-bottom: 8px;\"><a href=\"\/en\/modular-building-guide\/steel-modular-hybrid-construction\/\">Steel modular and hybrid construction: steel, timber and concrete combined<\/a><\/li>\n<li style=\"margin-bottom: 8px;\"><a href=\"\/en\/modular-building-guide\/modular-construction-costs\/\">What drives the cost of modular construction<\/a><\/li>\n<li style=\"margin-bottom: 8px;\"><a href=\"\/en\/modular-building-guide\/serial-and-modular-construction\/\">Serial and modular construction: terms and differences<\/a><\/li>\n<li style=\"margin-bottom: 8px;\"><a href=\"\/en\/modular-building-guide\/building-permit-modular-construction-germany\/\">Building permits for modular buildings in Germany and type approval<\/a><\/li>\n<li style=\"margin-bottom: 8px;\"><a href=\"\/en\/modular-building-guide\/fire-protection-sound-insulation-modular\/\">Fire protection and sound insulation in steel modular construction<\/a><\/li>\n<li style=\"margin-bottom: 8px;\"><a href=\"\/en\/modular-building-guide\/funding-modular-buildings-germany\/\">Funding for modular buildings in Germany: KfW, QNG and state programmes<\/a><\/li>\n<li style=\"margin-bottom: 8px;\"><a href=\"\/en\/modular-building-guide\/\">Back to the overview: modular building guide<\/a><\/li>\n<\/ul>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Planning a project? <a href=\"\/en\/kontakt\/\">Send us your enquiry<\/a>, ideally with drawings. You will find all system data on our <a href=\"\/en\/modular-building-system-facts\/\">Facts and figures<\/a> page.<\/p>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;60px&#8221;][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row el_class=&#8221;pac-guide-2026&#8243;][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_empty_space height=&#8221;50px&#8221;][vc_column_text] Office to residential: conversion with modular construction Pacarada Modular Building Systems, Kelkheim (Taunus), Germany \u00b7 &hellip; <\/p>\n","protected":false},"author":2,"featured_media":0,"parent":75418,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-no-paddings.php","meta":{"footnotes":""},"class_list":["post-75904","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Office to residential: conversion with modular construction - Pacarada Modular Building Systems<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/office-to-residential-conversion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Office to residential: conversion with modular construction - Pacarada Modular Building Systems\" \/>\n<meta property=\"og:description\" content=\"[vc_row el_class=&#8221;pac-guide-2026&#8243;][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_empty_space height=&#8221;50px&#8221;][vc_column_text] Office to residential: conversion with modular construction Pacarada Modular Building Systems, Kelkheim (Taunus), Germany \u00b7 &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/office-to-residential-conversion\/\" \/>\n<meta property=\"og:site_name\" content=\"Pacarada Modular Building Systems\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T17:30:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pacaradamodularsystems.de\/wp-content\/uploads\/2022\/04\/SLIDER-03.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1900\" \/>\n\t<meta property=\"og:image:height\" content=\"723\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-guide\\\/office-to-residential-conversion\\\/\",\"url\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-guide\\\/office-to-residential-conversion\\\/\",\"name\":\"Office to residential: conversion with modular construction - Pacarada Modular Building Systems\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#website\"},\"datePublished\":\"2026-10-07T09:37:51+00:00\",\"dateModified\":\"2026-10-08T17:30:16+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-guide\\\/office-to-residential-conversion\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-guide\\\/office-to-residential-conversion\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-guide\\\/office-to-residential-conversion\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Modular building guide\",\"item\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-guide\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Office to residential: conversion with modular construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#website\",\"url\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/\",\"name\":\"Pacarada Modular Building Systems\",\"description\":\"Modular buildings made in Germany\",\"publisher\":{\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#organization\",\"name\":\"Pacarada Modular Building Systems\",\"url\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/PACARADA_MODULAR_LOGO.png\",\"contentUrl\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/PACARADA_MODULAR_LOGO.png\",\"width\":200,\"height\":50,\"caption\":\"Pacarada Modular Building Systems\"},\"image\":{\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"parentOrganization\":{\"@type\":\"Organization\",\"name\":\"Pacarada Group\",\"url\":\"https:\\\/\\\/pacarada.de\\\/\"},\"sameAs\":[\"https:\\\/\\\/pacaradasystem.de\\\/\"],\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Benzstra\u00dfe 10\",\"postalCode\":\"65779\",\"addressLocality\":\"Kelkheim (Taunus)\",\"addressCountry\":\"DE\"},\"telephone\":\"+49 6195 6774173\",\"email\":\"info@pacaradamodularsystems.de\",\"foundingDate\":\"2020\",\"legalName\":\"SHS & P3 GmbH\",\"vatID\":\"DE264087948\",\"areaServed\":\"DE\",\"knowsAbout\":[\"Modulbau\",\"modular construction\",\"Stahlmodulbau\",\"Raummodule\",\"Badmodule\",\"Aufstockung\",\"serielles Bauen\",\"Kreislaufwirtschaft im Bau\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Office to residential: conversion with modular construction - Pacarada Modular Building Systems","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/office-to-residential-conversion\/","og_locale":"en_US","og_type":"article","og_title":"Office to residential: conversion with modular construction - Pacarada Modular Building Systems","og_description":"[vc_row el_class=&#8221;pac-guide-2026&#8243;][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_empty_space height=&#8221;50px&#8221;][vc_column_text] Office to residential: conversion with modular construction Pacarada Modular Building Systems, Kelkheim (Taunus), Germany \u00b7 &hellip;","og_url":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/office-to-residential-conversion\/","og_site_name":"Pacarada Modular Building Systems","article_modified_time":"2026-10-08T17:30:16+00:00","og_image":[{"width":1900,"height":723,"url":"https:\/\/pacaradamodularsystems.de\/wp-content\/uploads\/2022\/04\/SLIDER-03.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/office-to-residential-conversion\/","url":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/office-to-residential-conversion\/","name":"Office to residential: conversion with modular construction - Pacarada Modular Building Systems","isPartOf":{"@id":"https:\/\/pacaradamodularsystems.de\/#website"},"datePublished":"2026-10-07T09:37:51+00:00","dateModified":"2026-10-08T17:30:16+00:00","breadcrumb":{"@id":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/office-to-residential-conversion\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/office-to-residential-conversion\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/office-to-residential-conversion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pacaradamodularsystems.de\/en\/"},{"@type":"ListItem","position":2,"name":"Modular building guide","item":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-guide\/"},{"@type":"ListItem","position":3,"name":"Office to residential: conversion with modular construction"}]},{"@type":"WebSite","@id":"https:\/\/pacaradamodularsystems.de\/#website","url":"https:\/\/pacaradamodularsystems.de\/","name":"Pacarada Modular Building Systems","description":"Modular buildings made in Germany","publisher":{"@id":"https:\/\/pacaradamodularsystems.de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pacaradamodularsystems.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pacaradamodularsystems.de\/#organization","name":"Pacarada Modular Building Systems","url":"https:\/\/pacaradamodularsystems.de\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pacaradamodularsystems.de\/#\/schema\/logo\/image\/","url":"https:\/\/pacaradamodularsystems.de\/wp-content\/uploads\/2020\/12\/PACARADA_MODULAR_LOGO.png","contentUrl":"https:\/\/pacaradamodularsystems.de\/wp-content\/uploads\/2020\/12\/PACARADA_MODULAR_LOGO.png","width":200,"height":50,"caption":"Pacarada Modular Building Systems"},"image":{"@id":"https:\/\/pacaradamodularsystems.de\/#\/schema\/logo\/image\/"},"parentOrganization":{"@type":"Organization","name":"Pacarada Group","url":"https:\/\/pacarada.de\/"},"sameAs":["https:\/\/pacaradasystem.de\/"],"address":{"@type":"PostalAddress","streetAddress":"Benzstra\u00dfe 10","postalCode":"65779","addressLocality":"Kelkheim (Taunus)","addressCountry":"DE"},"telephone":"+49 6195 6774173","email":"info@pacaradamodularsystems.de","foundingDate":"2020","legalName":"SHS & P3 GmbH","vatID":"DE264087948","areaServed":"DE","knowsAbout":["Modulbau","modular construction","Stahlmodulbau","Raummodule","Badmodule","Aufstockung","serielles Bauen","Kreislaufwirtschaft im Bau"]}]}},"_links":{"self":[{"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/pages\/75904","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/comments?post=75904"}],"version-history":[{"count":2,"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/pages\/75904\/revisions"}],"predecessor-version":[{"id":76176,"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/pages\/75904\/revisions\/76176"}],"up":[{"embeddable":true,"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/pages\/75418"}],"wp:attachment":[{"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/media?parent=75904"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}