{"id":75366,"date":"2026-09-30T15:52:33","date_gmt":"2026-09-30T13:52:33","guid":{"rendered":"https:\/\/pacaradamodularsystems.de\/modular-building-system-facts\/"},"modified":"2026-09-30T19:56:50","modified_gmt":"2026-09-30T17:56:50","slug":"modular-building-system-facts","status":"publish","type":"page","link":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-system-facts\/","title":{"rendered":"The modular building system in facts and figures"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row el_class=&#8221;pac-facts-2026&#8243;][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_empty_space height=&#8221;50px&#8221;][vc_column_text]<\/p>\n<h2 style=\"font-size: 30px; text-align: left;\">The Pacarada modular building system in facts and figures<\/h2>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">This page brings together the key facts about the Pacarada Modular Building System: what the Cube is, how the system is built up, where it is made and which buildings have already been built with it. Last updated: September 2026.<\/p>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">The system at a glance<\/h3>\n<table style=\"width: 100%; border-collapse: collapse; font-size: 16px; line-height: 1.5; margin: 12px 0 8px;\">\n<tbody>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Manufacturer<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Pacarada Modular Building Systems, Kelkheim (Taunus), Germany, a company of the <a href=\"https:\/\/pacarada.de\/\">Pacarada Group<\/a><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Origin<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Engineered and manufactured in Germany<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Core component<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\"><a href=\"\/en\/innovative-solution\/\">The Cube<\/a>: an internationally patented steel connection node<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Construction methods<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">1D (columns and beams), 2D (wall and floor elements), 3D (finished room modules), combinable in one building<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Materials<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Steel, timber, concrete and plastic at the same node, e.g. steel &amp; steel, steel &amp; timber, steel &amp; concrete<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Building height<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">1 to 50 storeys<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Assembly<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Bolted and plugged instead of welded; buildings stay demountable and reusable<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Electrical installation<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Plug-in system as in the automotive industry, prepared in the factory<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Energy standard<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Up to Effizienzhaus 40 (Frankfurt am Main, In der Au 18, with QNG and DGNB)<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Circular economy<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">83% of material offcuts are recyclable; target: 1% waste by 2030<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Product range<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">More than 400 system products from 1 January 2027 on <a href=\"https:\/\/pacaradasystem.de\/?lang=en\">pacaradasystem.de<\/a><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Cooperation<\/th>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Open system for contractors, design practices and suppliers; partner programme via <a href=\"https:\/\/pacaradasystem.de\/partners.php?lang=en\">pacaradasystem.de<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">Built with the system<\/h3>\n<table style=\"width: 100%; border-collapse: collapse; font-size: 16px; line-height: 1.5; margin: 12px 0 8px;\">\n<thead>\n<tr>\n<th scope=\"col\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Project<\/th>\n<th scope=\"col\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Scope<\/th>\n<th scope=\"col\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Period<\/th>\n<th scope=\"col\" style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2; background: #f3f6f8; color: #0b3b5b; font-weight: 600;\">Result<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Gartenstra\u00dfe 64, Liederbach am Taunus<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">First modular project of the Pacarada Group<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">2013<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Start of modular construction<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Holzhofallee 36, Darmstadt<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Vacant office building converted into 197 homes, with bathroom modules, an extension and added storeys<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">09\/2021 to 02\/2023<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">18 months construction time, 44% faster than conventional, KfW 55<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">H\u00f6chster Stra\u00dfe 1C, Liederbach am Taunus<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">30 apartments from 33 modules above a refurbished supermarket<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">2024<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">1D, 2D and 3D combined in one building<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">In der Au 18, Frankfurt am Main<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Modular new build with 123 apartments<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">2025<\/td>\n<td style=\"text-align: left; vertical-align: top; padding: 10px 14px; border-bottom: 1px solid #d7dde2;\">Effizienzhaus 40, QNG and DGNB<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">With the same system, 1,156 homes are being planned in the Rhine-Main region, including the Lincoln quarter in Darmstadt with 274 homes and Benzstra\u00dfe 10 in Kelkheim (Taunus) with 102 homes. All projects of the group are on <a href=\"https:\/\/padahome.com\/?lang=en\">padahome.com<\/a>.<\/p>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">The Pacarada Group<\/h3>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">The system is backed by a group of companies from Kelkheim (Taunus), Germany: SHS Haustechnik GmbH (since 2003, building services), P3 GmbH (since 2008, general contractor with more than 2,000 conventionally built and refurbished homes) and Pacarada Modular Building Systems (since 2020). Design, building services, manufacturing and installation therefore come from one source. More about the group on <a href=\"https:\/\/pacarada.de\/\">pacarada.de<\/a>.<\/p>\n<h3 style=\"font-size: 22px; text-align: left; margin-top: 32px;\">Frequently asked questions<\/h3>\n<h4 style=\"font-size: 19px; text-align: left; margin-top: 22px;\">Who makes the Pacarada modular building system?<\/h4>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Pacarada Modular Building Systems, based in Kelkheim (Taunus), Germany, a company of the Pacarada Group. The system and its core component, the Cube, are engineered and manufactured in Germany.<\/p>\n<h4 style=\"font-size: 19px; text-align: left; margin-top: 22px;\">What is the Cube?<\/h4>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">The Cube is an internationally patented steel connection node. Columns, beams, wall and floor elements and complete room modules are bolted and plugged to it. This single node is the basis for buildings from one to 50 storeys.<\/p>\n<h4 style=\"font-size: 19px; text-align: left; margin-top: 22px;\">What are the advantages over conventional construction?<\/h4>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Most of the work happens in the factory. That shortens construction time (44% faster than conventional construction on the Darmstadt project), needs fewer skilled workers on site, makes the schedule predictable and reduces waste. Because nothing is welded, buildings can later be converted, dismantled and reused.<\/p>\n<h4 style=\"font-size: 19px; text-align: left; margin-top: 22px;\">Which buildings is the system suitable for?<\/h4>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Housing and student accommodation, schools and nurseries, healthcare and care buildings, hotels, offices and commercial buildings. It works for new builds as well as for added storeys, extensions and the conversion of existing buildings.<\/p>\n<h4 style=\"font-size: 19px; text-align: left; margin-top: 22px;\">Which materials can be combined?<\/h4>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Steel, timber, concrete and plastic can be connected at the Cube, for example as steel &#038; steel, steel &#038; timber or steel &#038; concrete. Columns and beams (1D), wall and floor elements (2D) and finished room modules (3D) can be combined in one building.<\/p>\n<h4 style=\"font-size: 19px; text-align: left; margin-top: 22px;\">Can any company build with the system?<\/h4>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Yes. The Pacarada Modular Building System, also called the Pacarada Modular Business System, is open to every contractor, design practice and supplier. The partner programme and all system components are on pacaradasystem.de.<\/p>\n<h4 style=\"font-size: 19px; text-align: left; margin-top: 22px;\">Where can I get technical documents for my project?<\/h4>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Technical documents and a first assessment for your site are available via our contact form or directly from Pacarada Modular Building Systems in Kelkheim (Taunus), Germany.<\/p>\n<p style=\"font-size: 18px; line-height: 1.6; text-align: left;\">Background on the comparison with conventional building, added storeys, schools, steel and hybrid construction and costs is in our <a href=\"\/en\/modular-building-guide\/\">modular building guide<\/a>. Planning a project? <a href=\"\/en\/kontakt\/\">Get in touch<\/a>.<\/p>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;60px&#8221;][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row el_class=&#8221;pac-facts-2026&#8243;][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_empty_space height=&#8221;50px&#8221;][vc_column_text] The Pacarada modular building system in facts and figures This page brings together the key &hellip; <\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-no-paddings.php","meta":{"footnotes":""},"class_list":["post-75366","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The modular building system in facts and figures - Pacarada Modular Building Systems<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pacaradamodularsystems.de\/en\/modular-building-system-facts\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The modular building system in facts and figures - Pacarada Modular Building Systems\" \/>\n<meta property=\"og:description\" content=\"[vc_row el_class=&#8221;pac-facts-2026&#8243;][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_empty_space height=&#8221;50px&#8221;][vc_column_text] The Pacarada modular building system in facts and figures This page brings together the key &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pacaradamodularsystems.de\/en\/modular-building-system-facts\/\" \/>\n<meta property=\"og:site_name\" content=\"Pacarada Modular Building Systems\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-30T17:56:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pacaradamodularsystems.de\/wp-content\/uploads\/2022\/04\/SLIDER-03.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1900\" \/>\n\t<meta property=\"og:image:height\" content=\"723\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-system-facts\\\/\",\"url\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-system-facts\\\/\",\"name\":\"The modular building system in facts and figures - Pacarada Modular Building Systems\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#website\"},\"datePublished\":\"2026-09-30T13:52:33+00:00\",\"dateModified\":\"2026-09-30T17:56:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-system-facts\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-system-facts\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/modular-building-system-facts\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The modular building system in facts and figures\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#website\",\"url\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/\",\"name\":\"Pacarada Modular Building Systems\",\"description\":\"Modular buildings made in Germany\",\"publisher\":{\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#organization\",\"name\":\"Pacarada Modular Building Systems\",\"url\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/PACARADA_MODULAR_LOGO.png\",\"contentUrl\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/PACARADA_MODULAR_LOGO.png\",\"width\":200,\"height\":50,\"caption\":\"Pacarada Modular Building Systems\"},\"image\":{\"@id\":\"https:\\\/\\\/pacaradamodularsystems.de\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"parentOrganization\":{\"@type\":\"Organization\",\"name\":\"Pacarada Group\",\"url\":\"https:\\\/\\\/pacarada.de\\\/\"},\"sameAs\":[\"https:\\\/\\\/pacaradasystem.de\\\/\"],\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Benzstra\u00dfe 10\",\"postalCode\":\"65779\",\"addressLocality\":\"Kelkheim (Taunus)\",\"addressCountry\":\"DE\"},\"telephone\":\"+49 6195 6774173\",\"email\":\"info@pacaradamodularsystems.de\",\"foundingDate\":\"2020\",\"legalName\":\"SHS & P3 GmbH\",\"vatID\":\"DE264087948\",\"areaServed\":\"DE\",\"knowsAbout\":[\"Modulbau\",\"modular construction\",\"Stahlmodulbau\",\"Raummodule\",\"Badmodule\",\"Aufstockung\",\"serielles Bauen\",\"Kreislaufwirtschaft im Bau\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The modular building system in facts and figures - Pacarada Modular Building Systems","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-system-facts\/","og_locale":"en_US","og_type":"article","og_title":"The modular building system in facts and figures - Pacarada Modular Building Systems","og_description":"[vc_row el_class=&#8221;pac-facts-2026&#8243;][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_empty_space height=&#8221;50px&#8221;][vc_column_text] The Pacarada modular building system in facts and figures This page brings together the key &hellip;","og_url":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-system-facts\/","og_site_name":"Pacarada Modular Building Systems","article_modified_time":"2026-09-30T17:56:50+00:00","og_image":[{"width":1900,"height":723,"url":"https:\/\/pacaradamodularsystems.de\/wp-content\/uploads\/2022\/04\/SLIDER-03.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-system-facts\/","url":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-system-facts\/","name":"The modular building system in facts and figures - Pacarada Modular Building Systems","isPartOf":{"@id":"https:\/\/pacaradamodularsystems.de\/#website"},"datePublished":"2026-09-30T13:52:33+00:00","dateModified":"2026-09-30T17:56:50+00:00","breadcrumb":{"@id":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-system-facts\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pacaradamodularsystems.de\/en\/modular-building-system-facts\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pacaradamodularsystems.de\/en\/modular-building-system-facts\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/pacaradamodularsystems.de\/en\/"},{"@type":"ListItem","position":2,"name":"The modular building system in facts and figures"}]},{"@type":"WebSite","@id":"https:\/\/pacaradamodularsystems.de\/#website","url":"https:\/\/pacaradamodularsystems.de\/","name":"Pacarada Modular Building Systems","description":"Modular buildings made in Germany","publisher":{"@id":"https:\/\/pacaradamodularsystems.de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pacaradamodularsystems.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pacaradamodularsystems.de\/#organization","name":"Pacarada Modular Building Systems","url":"https:\/\/pacaradamodularsystems.de\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pacaradamodularsystems.de\/#\/schema\/logo\/image\/","url":"https:\/\/pacaradamodularsystems.de\/wp-content\/uploads\/2020\/12\/PACARADA_MODULAR_LOGO.png","contentUrl":"https:\/\/pacaradamodularsystems.de\/wp-content\/uploads\/2020\/12\/PACARADA_MODULAR_LOGO.png","width":200,"height":50,"caption":"Pacarada Modular Building Systems"},"image":{"@id":"https:\/\/pacaradamodularsystems.de\/#\/schema\/logo\/image\/"},"parentOrganization":{"@type":"Organization","name":"Pacarada Group","url":"https:\/\/pacarada.de\/"},"sameAs":["https:\/\/pacaradasystem.de\/"],"address":{"@type":"PostalAddress","streetAddress":"Benzstra\u00dfe 10","postalCode":"65779","addressLocality":"Kelkheim (Taunus)","addressCountry":"DE"},"telephone":"+49 6195 6774173","email":"info@pacaradamodularsystems.de","foundingDate":"2020","legalName":"SHS & P3 GmbH","vatID":"DE264087948","areaServed":"DE","knowsAbout":["Modulbau","modular construction","Stahlmodulbau","Raummodule","Badmodule","Aufstockung","serielles Bauen","Kreislaufwirtschaft im Bau"]}]}},"_links":{"self":[{"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/pages\/75366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/comments?post=75366"}],"version-history":[{"count":3,"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/pages\/75366\/revisions"}],"predecessor-version":[{"id":75495,"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/pages\/75366\/revisions\/75495"}],"wp:attachment":[{"href":"https:\/\/pacaradamodularsystems.de\/en\/wp-json\/wp\/v2\/media?parent=75366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}